Dix Hills Fire District – Station 1
Project:
$454,000
Architect:
BAR – Architects, P.C.
Contract Type:
The Dix Hills Fire District came to BAR – Architects, P.C. looking to upgrade the exterior façade of their substation No1. BAR prepared several design options along with budget estimates so that the District could evaluate the project and select a work scope that would work within budget parameters.