Kings Park Central School District

Project:
$400,000 Capital Improvements

Architect:
BAR – Architects,  P.C.

Handicapped accessibility upgrades were required within the Ralph J. Osgood Elementary School. The building was assessed for compliance with CABO/ANSI 117.1 – 1998 and ADA. Documents were prepared for the installation of a three-stop elevator, as well as restroom upgrades throughout the building. This project was completed on schedule, with new accommodations in place for the start of the 2002/2003 school year.